Following the results of a water study of the village of Arena’s water systems, the village is preparing to build a secondary well system which is set to cost the village at least $2.1 million over the next three years.
Following the results of a water study of the village of Arena’s water systems, the village is preparing to build a secondary well system which is set to cost the village at least $2.1 million over the next three years.